Second Tokushima Factory, Otsuka Pharmaceutical Co., Ltd. – FDA 483, Sep 10, 2019
An FDA inspection of Kyowa Pharmaceutical Co., Ltd.'s Second Tokushima Factory in Kawauchi-cho, Japan, identified significant deficiencies in environmental monitoring practices. The observations highlight inadequate procedures for air sampling, differential pressure monitoring, and surface sampling, alongside failures in investigating atypical environmental monitoring results. These issues indicate a lack of robust controls necessary to prevent potential contamination in drug manufacturing areas.
- Inspection date
- September 10, 2019
- Product type
- drugs
ID · a01cb126-0c4a-4d16-a221-71b853e8bff1
Document or profile
One record shows the event. A profile shows the pattern.
Buy this document for the source file and details behind this single event.
Choose full profile access to connect related records, sites, people, citations, and enforcement history in one view.