FDA 483 - franck's lab inc - May 23, 2014
Discuss this record with AI
Document or profile
One record shows the event. A profile shows the pattern.
Buy this document for the source file and details behind this single event.
Choose full profile access to connect related records, sites, people, citations, and enforcement history in one view.
The FDA inspection of a drug manufacturing facility revealed multiple deficiencies across its aseptic processing areas and quality systems. The facility's ISO 7 clean room and ISO 8 ante-room had unsealed ceiling tiles, visible tears in two ISO 7 ceiling tiles (one porous), and walls that were not smooth or easily cleanable. Flaking paint and rust were observed on an ISO-5 laminar flow hood bench. The impact of ongoing remodeling on ISO 7 clean room airflow was not assessed, nor was a risk assessment performed for potential product contamination.
The ISO 7 clean room contained inappropriate items like a radio, computer monitor, cardboard boxes, and a piece of wood. Dead insects were found on light panels above the ISO 5 laminar flow hood and the ante-room. Procedures to prevent microbiological contamination were not established. A pharmacy technician handled elastomeric infusion devices with bare hands before hand washing/gowning and without sanitization. These devices were later transferred to the ISO-5 processing bench without a sanitization step. Compounding instructions for Vancomycin were incomplete, lacking proper aseptic technique.
Cleaning and disinfecting procedures were deficient. ISO 5 surfaces were cleaned only with one solution, lacking a cleanser or sporicidal disinfectant. Conflicting written work instructions existed for sanitizers. A disinfectant bottle in use was over one year past its expiration date. Laminar flow hoods were relocated, potentially obstructing airflow, and the ISO 7 clean room was not qualified under these new conditions.
ID · d7a35c49-5f6f-4fbc-b18c-b9f656c3f7c8
Full citation text and observation details available on the Dashboard.