FDA 483 - RXQ Compounding LLC - September 21, 2015
Discuss this record with AI
Document or profile
One record shows the event. A profile shows the pattern.
Buy this document for the source file and details behind this single event.
Choose full profile access to connect related records, sites, people, citations, and enforcement history in one view.
The FDA inspection of an outsourcing facility revealed multiple deficiencies in aseptic processing, quality control, and record-keeping.
**Aseptic Processing Deficiencies:** * **Air Supply:** A smoke study of the ISO 7 clean room and ISO 5 hood showed smoke egress, indicating a deficient air supply system. Two sterile products, IC-Green 6.25mg/ml Ophthalmic Solution lot#08132015@1 (distributed) and Acetaminophen 10mg/ml Injectable lot#08212015@7 (on sterility test hold), were processed in the affected ISO 5 hood. * **Environmental Monitoring:** The firm failed to frequently monitor differential pressure readings during aseptic production. * **Sterilization Process Validation:** * Media fills for ISO 5 hood personnel did not simulate actual production or challenging conditions, specifically lacking a media fill for the (b)(4) sterilization method used for Acetaminophen 10mg/ml Injectable. * A (b)(4) used for (b)(4) sterilization of Acetaminophen 10mg/ml Injectable lot#08212015@7 was labeled "For research use only, not for in vitro diagnostic or for parenterals." * Depyrogenation validation for finished product vials and (b)(4) sterilization of stoppers, tools,
ID · 30dff3d1-6e42-415e-bf2b-72ded6ad6166
Full citation text and observation details available on the Dashboard.